Back to top

On Site Assembly and Kit Form Build

On Site Assembly and Kit Form Build

Date: 07th September 2018  |   Posted by: Barkell Team  |   Posted in: Press release

Barkell sometimes carry out on site assembly works and kit form builds where access or space is limited.

In this instance, the AHU had to be built up starting from the rear plant room wall. Due to the size of the PHX it was sent in 8 individual cubes and built up within the section on site.

Barkell carried out the site assembly of all sections. In pictures: